Solutions Through  Technology  

Home ] Up ] Feedback ]

Paiman Owtad P.E.
Back Up Next

Paiman Owtad, P.E.

Principal / Manager

Mechanical Engineering

Mr. Owtad is a founding principal of Advantech Facility Design with over 14 years of extensive design and project management experience.  Mr. Owtad has experience in a variety of project types including commercial, institutional and industrial with specialization focus in the microelectronics industry. 

Professional Experience

1987 - 1999                 ADPMarshall, Tucson, AZ 

Education

Bachelor of Science in Mechanical Engineering, University of Arizona

Professional Registration

Professional Engineer in the following states:  AZ  

Project Experience 

Microelectronics

 

 

 

 

 

Analog Devices

Phase 2, Cavite, Philippines.  Assembly facility, 200,000 s.f. with 60,000 s.f. Class 1000 cleanroom.

 

Analog Devices

Phase I, Cavite Philippines.  Rework of existing chilled water plant.

 

Philips

Singapore.  Microelectronics foundry fab.  Proposal/interview, lead engineer.  Developed mechanical concepts.

 

IBM Corporation

Burlington Vermont.  B986 Mask House, 100,000 s.f. with 20,000 s.f. of Class 1000 cleanroom.  Re work of 750 ton glycol CHW plant.  Mask production facility.

 

IBM Corporation

Fab IIA/B San Jose, California.  Manufacturing upgrade, 14,000 s.f. Class 1000 and 10,000 cleanroom.

 

Wafertech

Camas, Washington.  Green field fabrication facility, 1,300,00 s.f. with 80,000 s.f. class 100 ballroom and 60,000 s.f. clean support.  Design of all mechanical building systems

 

Wafertech

Camas, Washington.  On-site design liaison for engineering systems.

 

TSMC

Fab 4.  Hsin-Chu, Taiwan.  200 mm wafer fabrication facility, 1,300,000 s.f. with 80,000 s.f. Class 100 ballroom and 20,000 s.f. clean support.  FFU design.

 

TSMC

Fab 4.  Hsin-Chu, Taiwan.  Test area, 40,000 s.f. Class 1000.

 

Micron Technology

Boise, Idaho.  Fab 1 remodel, 10,000 s.f. laboratory office conversion to cleanroom.  New penthouse and acid exhaust/makeup air system.

 

Micron Technology

Boise, Idaho.  Fab 1X Dram fabrication facility, 150,000 s.f. with 25,000 s.f. Class 1 cleanroom.

IBM Corporation

Burlington, Vermont.  Building 973, 12,000 s.f. office building.  New exhaust systems (acid, solvent, toxic).  Phased construction, no shutdowns.

 

IBM Corporation

East Fishkill, New York.  Complementary metal oxide silicon (FEOL/CMOS).  Conversion of 28,000 s.f. of office, computer, and cleanrooms into manufacturing cleanroom.

 

IBM Corporation

East Fishkill, New York.  Integrated Photolithography area (IPA), 20,000 s.f. conversion of existing building into cleanrooms.

 

IBM Corporation

East Fishkill, New York.  (FEOL) conversion of 25,000 s.f. existing building into cleanroom.

 

IBM Corporation

Burlington, Vermont.  Complementary metal oxide silicon (CMOS).  Conversion of 140,000 s.f. of existing building space into cleanroom.

 

IBM Corporation

East Fishkill, New York.  Pak Test.  Computer center and cleanroom, 8000 s.f.

 

IBM Corporation

East Fishkill, New York.  Deposition, Phase 1 and 2 conversion of 40,000 s.f. office into cleanroom.

 

Intel Corporation

Chandler, Arizona.  Laboratory/office facility/energy plant, 400,000 s.f.

 

Cray Research

Chippewa Falls Wisconsin.  Manufacturing facility, 60,000 s.f. cleanroom.

 

Shipley Chemical Co.

Marlborough, Massachusetts.  VHP micro manufacturing facility, 16,000 s.f.

 

Micron Fab 4 Expansion

Advantech project:  Boise, Idaho.  Mechanical programming for Fab related spaces.  60,000 s.f. research facility with 28,600 s.f. of class 1 cleanroom. Non-clean laboratories, chemical distribution and storage.

 

 

Other Projects

 

 

 

Mayo Clinic

Scottsdale, Arizona.  Hospital (5 levels) 300,000 s.f.  Mechanical engineer.  Energy budget analysis.

Elmendorf Hospital

Elmendorf Air Force Base, Alaska.  New hospital/dental clinic, 430,000 s.f.

Ross Laboratories

Casa Grand, Arizona.  Rework and sound attenuation of existing bag dump and dust collection system.

U.S. Dept. of State

Zagreb, Croatia, Nairobi Kenya, and Dar-A-Salam, Tanzania.  US Embassies.  Proposal and interview.  Developed and presented mechanical concepts.

Illinois Wesleyan University

Bloomington, Illinois.  Research and teaching laboratories/classrooms, 140,000 s.f., 3 story.

Kerr-McGee Chemical LLC

Advantech project:  Henderson, Nevada.  Hearth Co/dust control project.  Four roasting hearths and two polishing bins.  5 m construction cost.

Phelps Dodge

Advantech project: Cypress Pump Station/Technology Center Expansion

 *note:  Some of the projects shown were completed with other design firms.  for direct Advantech projects, please refer to "Current Projects"

 

 

 

Home ] Up ]

 

Send mail to webmaster@AdvantechAE.com with questions or comments about this web site.
Last modified: March 20, 2000