|
| |
Paiman Owtad, P.E.
Principal / Manager
Mechanical
Engineering
Mr. Owtad
is a founding principal of Advantech Facility Design with over 14 years of
extensive design and project management experience. Mr. Owtad has experience in a variety of project types
including commercial, institutional and industrial with specialization focus in
the microelectronics industry.
Professional Experience
1987
- 1999
ADPMarshall, Tucson, AZ
Education
Bachelor
of Science in Mechanical Engineering, University of Arizona
Professional Registration
Professional
Engineer in the following states: AZ
Project Experience
|
Microelectronics
|
|
|
|
|
|
|
|
Analog
Devices
|
Phase
2, Cavite, Philippines. Assembly
facility, 200,000 s.f. with 60,000 s.f. Class 1000 cleanroom.
|
|
|
Analog
Devices
|
Phase
I, Cavite Philippines. Rework
of existing chilled water plant.
|
|
|
Philips
|
Singapore.
Microelectronics foundry fab.
Proposal/interview, lead engineer.
Developed mechanical concepts.
|
|
|
IBM
Corporation
|
Burlington
Vermont. B986 Mask House,
100,000 s.f. with 20,000 s.f. of Class 1000 cleanroom.
Re work of 750 ton glycol CHW plant.
Mask production facility.
|
|
|
IBM
Corporation
|
Fab
IIA/B San Jose, California. Manufacturing
upgrade, 14,000 s.f. Class 1000 and 10,000 cleanroom.
|
|
|
Wafertech
|
Camas,
Washington. Green field
fabrication facility, 1,300,00 s.f. with 80,000 s.f. class 100 ballroom
and 60,000 s.f. clean support. Design
of all mechanical building systems
|
|
|
Wafertech
|
Camas,
Washington. On-site design
liaison for engineering systems.
|
|
|
TSMC
|
Fab
4. Hsin-Chu, Taiwan.
200 mm wafer fabrication facility, 1,300,000 s.f. with 80,000 s.f.
Class 100 ballroom and 20,000 s.f. clean support.
FFU design.
|
|
|
TSMC
|
Fab
4. Hsin-Chu, Taiwan.
Test area, 40,000 s.f. Class 1000.
|
|
|
Micron
Technology
|
Boise,
Idaho. Fab 1 remodel, 10,000
s.f. laboratory office conversion to cleanroom.
New penthouse and acid exhaust/makeup air system.
|
|
|
Micron
Technology
|
Boise,
Idaho. Fab 1X Dram
fabrication facility, 150,000 s.f. with 25,000 s.f. Class 1 cleanroom.
|
|
IBM
Corporation
|
Burlington,
Vermont. Building 973, 12,000
s.f. office building. New
exhaust systems (acid, solvent, toxic).
Phased construction, no shutdowns.
|
|
|
IBM
Corporation
|
East
Fishkill, New York. Complementary
metal oxide silicon (FEOL/CMOS). Conversion
of 28,000 s.f. of office, computer, and cleanrooms into manufacturing
cleanroom.
|
|
|
IBM
Corporation
|
East
Fishkill, New York. Integrated
Photolithography area (IPA), 20,000 s.f. conversion of existing building
into cleanrooms.
|
|
|
IBM
Corporation
|
East
Fishkill, New York. (FEOL)
conversion of 25,000 s.f. existing building into cleanroom.
|
|
|
IBM
Corporation
|
Burlington,
Vermont. Complementary metal
oxide silicon (CMOS). Conversion
of 140,000 s.f. of existing building space into cleanroom.
|
|
|
IBM
Corporation
|
East
Fishkill, New York. Pak Test.
Computer center and cleanroom, 8000 s.f.
|
|
|
IBM
Corporation
|
East
Fishkill, New York. Deposition,
Phase 1 and 2 conversion of 40,000 s.f. office into cleanroom.
|
|
|
Intel
Corporation
|
Chandler,
Arizona. Laboratory/office
facility/energy plant, 400,000 s.f.
|
|
|
Cray
Research
|
Chippewa
Falls Wisconsin. Manufacturing
facility, 60,000 s.f. cleanroom.
|
|
|
Shipley
Chemical Co.
|
Marlborough,
Massachusetts. VHP micro
manufacturing facility, 16,000 s.f.
|
|
|
Micron
Fab 4 Expansion
|
Advantech
project: Boise, Idaho.
Mechanical programming for Fab related spaces.
60,000 s.f. research facility with 28,600 s.f. of class 1 cleanroom.
Non-clean laboratories, chemical distribution and storage.
|
|
|
Other
Projects
|
|
|
|
|
|
Mayo
Clinic
|
Scottsdale,
Arizona. Hospital (5 levels)
300,000 s.f. Mechanical
engineer. Energy budget
analysis.
|
|
Elmendorf
Hospital
|
Elmendorf
Air Force Base, Alaska. New
hospital/dental clinic, 430,000 s.f.
|
|
Ross
Laboratories
|
Casa
Grand, Arizona. Rework and
sound attenuation of existing bag dump and dust collection system.
|
|
U.S.
Dept. of State
|
Zagreb,
Croatia, Nairobi Kenya, and Dar-A-Salam, Tanzania. US Embassies. Proposal
and interview. Developed and
presented mechanical concepts.
|
|
Illinois
Wesleyan University
|
Bloomington,
Illinois. Research and
teaching laboratories/classrooms, 140,000 s.f., 3 story.
|
|
Kerr-McGee
Chemical LLC
|
Advantech
project: Henderson, Nevada.
Hearth Co/dust control project.
Four roasting hearths and two polishing bins.
5 m construction cost.
|
|
Phelps
Dodge
|
Advantech
project: Cypress Pump Station/Technology Center Expansion
|
*note: Some
of the projects shown were completed with other design firms. for
direct Advantech projects, please refer to "Current
Projects"
|