|
| |
Charles Giroud, P.E.
Principal / Manager
Electrical
Engineering
Mr.
Giroud is a founding principal of Advantech Facility Design with over 16 years
of diversified experience in the design and construction industry. Mr.
Giroud’s experience includes multiple project types including residential,
commercial and industrial facilities with specialization biotechnology and
microelectronic facilities.
Professional Experience
1995
- 1999
ADPMarshall, Tucson, AZ
1994
- 1995
IPS/IES/ Conshohocken, PA
1993
- 1994
BRR Inc., Devon, PA
1987
- 1993
CUH2A, Princeton, NJ
Education
Bachelor
of Science in Electrical Engineering, Pennsylvania State University
Certificates:
High
and Medium Voltage Systems, Protection and Coordination - Hughes Institute
Environmental
Protection, Protection for Signal and Line voltage Disturbance - Transector
Systems
Electric
Power Distribution, Industrial Plans and Commercial Buildings - IEEE
Power Quality for the Semiconductor Fabrication Industry- EPRI
Professional Registration
Professional
Engineer in the following states: AZ, CA, CO, ID, MA, NM, NY, OR, PA, TX, VA,
VT, WA
Project Experience
|
Microelectronics
|
|
|
|
|
|
Analog
Devices
|
Phase
2, Cavite, Philippines. Assembly
facility, 200,000 s.f. with 60,000 s.f. Class 1000 cleanroom.
|
|
Wafertech
Malaysia
|
Kulim
Malaysia. Fabrication
facility, 1,2000,000 s.f. with 80,000 s.f. Class 100 ballroom and
minienvironments.
|
|
IBM
Corporation
|
Burlington
Vermont. Tool upgrades,
500,000 s.f. facility analysis and modification for 300 tool replacements.
|
|
IBM
Corporation
|
Burlington
Vermont. B986 Mask House,
100,000 s.f. with 20,000 s.f. of Class 1000 cleanroom. Mask production facility.
|
|
Intel
Corporation
|
Chandler,
Arizona. Fab 12 LCE, 84,000
s.f. with 30,000 s.f. Class 1 cleanroom.
|
|
Intel
Corporation
|
Santa
Clara, CA. Mask operations
facility, 100,000 s.f. with 55,000 s.f. Class 1000 cleanroom.
|
|
Micron
Technology
|
Lehi,
Utah. Fab 4 fabrication
facility, 200 mm production, 80,000 s.f. Class 1/10 fab and 20,000 s.f.
Class 1/10 clean support.
|
|
Micron
Technology
|
Boise,
Idaho. Fab 1X Dram
fabrication facility, 150,000 s.f. with 25,000 s.f. Class 1 cleanroom.
|
|
Submicron
Technology
|
Bangkok,
Thailand. SMT-1 fabrication
facility, 570,000 s.f. with 50,000 s.f. Class 100 cleanroom.
|
|
Wafertech
|
Camas,
Washington. Green field
fabrication facility, 1,300,00 s.f. with 80,000 s.f. class 100 ballroom
and 60,000 s.f. clean support. Design
of all electrical building systems
|
|
Biotechnology
|
|
|
|
|
|
Proctor
& Gamble
|
Cincinnati,
Ohio. Pharmaceutical
laboratory/research and administration facility, 500,000 s.f.
|
|
Eli
Lilly & Co.
|
Indianapolis,
Indiana. Pharmaceutical
research and administration facility.
|
|
Eli
Lilly & Co.
|
Indianapolis
Indiana. Data Center, 4,000
s.f.
|
|
Univ.
of Maryland
|
Baltimore,
Maryland. Pharmaceutical
research facility, 300,000 s.f.
|
|
Rorer
Pharmaceuticals
|
Collegeville,
Pennsylvania. Pharmaceutical
research, administration and pilot plan facility, 1 million s.f.
|
|
Rorer
Pharmaceuticals
|
King
of Prussia Pennsylvania. Data
center, 3000 s.f.
|
|
Data
Centers
|
|
|
|
|
|
Veterans Administration Building
|
Philadelphia, Pennsylvania. Data center/administration building. New facility included 2,000 kVA parallel static UPS with
PDUs and power shut down controls. 3000
kW emergency generation system, 500,000 s.f.
|
|
Smith Kline Inc.
|
Valley Forge, Pennsylvania. Data center analysis of critical systems maintenance
program, 5000 s.f.
|
|
Tower
Inc.
|
Philadelphia,
Pennsylvania. Disaster
recovery center for financial operations.
500 kVA UPS system, PDUs, power shutdown controls, FM 200
suppression system 1000 kW emergency generator system, 6000 s.f.
|
|
Other
Projects
|
|
|
|
|
|
Trenton
Psychiatric Hospital
|
Trenton,
New Jersey. Generator control
upgrade.
|
|
New
England Container
|
Providence,
Rhode Island. Drum furnace
reclamation.
|
|
Taste
Maker, Inc.
|
Cincinnati,
Ohio. Design and installation
of thermal oxidizer.
|
|
Kerr-McGee
Chemical LLC
|
Advantech
project: Henderson, Nevada. Hearth
Co/dust control project. Four
roasting hearths and two polishing bins.
5 m construction cost.
|
|
Phelps
Dodge
|
Advantech
project: Cypress Pump Station/On Pond transmission line
relocation/Technology Center Expansion
|
*note: Some
of the projects shown were completed with other design firms. for
direct Advantech projects, please refer to "Current
Projects"
|
Affiliations
|
|
|
|
|
|
IEEE
|
International
Society of Electrical and Electronic Engineers
|
|
ISPE
|
International
Society of Pharmaceutical Engineers
|
|